skip to main content

Bridge removal continued
10 August 2013

Dam placed

After ultrasonics used to remove bridge and post, electrosurgery used to remove excess gingiva, to enable better fit of bridge. Dam was placed, and 21 was irrigated with sodium hypochlorite using active irrigation, dried and them obturated with MTA.

Post
Post modified by removing threads ready to recement
Post
Post op, MTA obturation, fibre post in 32. Post and bridge recement Rely X cem
Picture
Picture of recemented bridge with better marginal fit.